Contractor abandons classroom construction

KARONGI – A Karongi-based contractor, Theogene Muganza, is on the run after abandoning the construction of classrooms at a local primary school in Rugabano sector, Karongi district. Sources say Muganza had obtained about Rwf19m out the total Rwf 65m to build 15 classrooms in December 2007at Saint Scholaire Bisusa, but disappeared before the work was completed.
no image
Times Reporter