[Editorial] An informed public is a prerequisite for accountability

The Water and Sanitation Corporation (WASAC) is now targeting a three-year period to be able to complete major projects that will deal with persistent water shortage. The WASAC chief executive told the media this week that the persistent water shortage that has resulted in rationing over the last two years was due to little water supply and the low capacity of existing infrastructure.
no image
Times Reporter